Enquire Now
×

specifications

STRUCTURE

  • Earthquake resistant frame structure with shear walls, and all internal and external walls are of RCC (no brickwork and plaster), using international construction technology designed by experienced structural engineers and proof checked by reputed engineering college.

FLOORING

  • Digital vitrified tiles (600 x1200 mm) in living, dining, kitchen and entrance lobby.
  • Digital vitrified tiles (600x600 mm) in all bedrooms.
  • Ceramic tiles (300x300 mm) in toilet and balconies.

WALLS, CEILINGS & WOODWORK

  • False ceiling in corners of living room.
  • POP/Gypsum plaster finish walls with OBD in pleasing shades.
  • Wardrobe (laminated partical boards): one in all bedrooms.

KITCHEN

  • Modular kitchen with accessories and granite working top along with stainless steel sink
  • Individual RO water unit 1 no. having storage capacity of 8 ltr.
  • Ceramic tiles on 600 mm dado above working platform and 1450 mm from floor on remaining walls.
  • One extra Stainless Steel Sink in service balcony.

MASTER TOILET

  • Plumbing done with prince/astral/or equivalent CPVC/PVC Pipe.
  • Wall-mounted EWC.
  • Granite counter top wash basin.
  • Shower area separated by fixed glass partition.
  • Mirror and Towel Rack.
  • Wall tiles (300x600 mm) up to ceiling height.
  • Jaguar, Somany, Hindware, Supreme or equivalent CP fitting.

DOOR AND WINDOW

  • Outer doors and windows aluminium powder coated/UPVC of 2100 mm height.
  • Internal wooden frames made of Marandi or equivalent wood.
  • All door shutters are laminated flush shutters of 2250 mm height.

OTHER TOILETS

  • Plumbing done with prince/astral/or equivalent CPVC/PVC Pipe.
  • Ceramic sanitary ware.
  • Wall tiles (300x600mm) up to ceiling height.
  • Jaguar, Somany, Hind Ware, Supreme or equivalent C.P fitting.

ELECTRICAL

  • Adequate light and power points in wall and ceiling.
  • ISI marked copper wire in PVC conduits with MCB. Modular switches. Conduits for DTH connection.
  • Intercom facilities for communication with lobby, main gate and other apartments.
  • Only provisions of split AC points in all bedrooms and drawing room.

SAFETY AND SECURITY

  • Video phone on main door.
  • Provision of optical fibre network, video surveillance system with CCTV cameras on boundary, entrance lobbies and main gate.
  • Fire prevention, suppression, detection and alarm system as per fire norms.

GREEN BUILDING SPECIFICATION WATER CONSERVATION

  • Rain water harvesting.
  • Efficient low flow plumbing fixtures.
  • Reuse of STP water for flushing and landscape to minimise potable or ground water usage.

ENERGY EFFICIENCY

  • LED based lighting in common areas.
  • Online solar system for basement lighting.

WASTE MANAGEMENT

  • Multi-colour bins for waste segregation at source.
  • Organic waste composter on site for composting.